Replacing power transformers at the 110/10 kV Šiaurinė transformer substation in Vilnius

AB "Lesto"

UAB Ekobana replaced power transformers, supplied equipment, and prepared a detailed design for the 110/10 kV Šiaurinė transformer substation at P. Lukšio St, Vilnius.

Under the contract, a detailed design was prepared; two old 40 MVA power transformers were disassembled, moved to the facilities of Lesto, AB, and mothballed; old 10 kV cables were dismantled; two new 63 MVA power transformers were delivered, installed, and tested; new 10 kV cables were laid; and, commissioning work was carried out.

UAB Ekobana fulfilled the contract impeccably: within budget and strictly in accordance with all the technical conditions and deadlines laid down in the contract.

2013
year started
63
MVA's most powerful in the ESO network
2014
year of project delivery